Anyone can photograph a finished kitchen. What tells you whether to trust a builder is what the site looked like in week six — so each project here shows the process, not just the reveal.
Mid-project. Original rimu framing exposed, new steel portal in, everything braced and dry before the weekend. The drop sheets stay down and the site gets swept every night — how a site is kept is how a job is run.
Finished. 34m² extension: oak joinery, stone bench, sliders to the north lawn. Fixed price held; the one variation (client-requested skylight) was priced and signed before the saw came out.
Finished. Three bedrooms, vertical cedar, hardwood deck. Consent to Code Compliance Certificate in nine months, with the council inspections passed first time.
Process. A walk-through at framing stage, on every project — it's the last cheap moment to move a wall, a window or a powerpoint, and clients always change something.
References from past clients available on request — we'd rather you rang a real person than read a quote we chose ourselves.
By arrangement, we'll walk you through a current project — tidy site, named crew, no staging.